Drainage and Rainwater Harvesting
Drainage and Rainwater Harvesting Read More »

Oct 2022 – We Have Electricity Read More »


Monday 16 May 2022 Read More »




Additional update for Friday 13 May 2022 Read More »
The bank at the top of the field was dug back ready for the retaining wall and the corner next to the neighbour’s drive was tidied up.
The tree trunk and some of the hedge at the top of the field were dug out in preparation for the electricity cable.
The site was dug down and levelled to start marking out the house layout on Monday.
What a fabulous first week with excellent site preparation progress.
Update for Friday 13 May 2022 Read More »

The big job today was to muckaway all of the earth and rubble removed from the bank and entranceway and the grass and soil from the site levelling yesterday
Muckaway Day – 13 May 2022 Read More »

We have a toilet – 12 May 2022 Read More »




A lot happened on Day 1 – 11 May 2022 Read More »

We have an entrance! – 11 May 2022 Read More »