A lot happened on Day 1 – 11 May 2022

By Dreamer / May 13, 2022
Crushed bricks and rubble arrived for the driveway base
All of the grass was removed to prepare for site levelling and grading
The fencing arrived and was installed by Mark and Richard. End of Day 1 image shows the site all tucked up ready for bed
Post Views: 16
← Previous Post
Next Post →
  • Build
  • Concrete Pouring
  • Craning
  • Decorating
  • Drainage
  • External Cladding
  • First Christmas
  • Floor Joists & Flooring
  • Foundations & Slab
  • Front Door
  • Groundworks
  • Hedge
  • ICF Construction
  • Insulation
  • Landscaping
  • Notices
  • Plantroom
  • Plastering
  • Pre-Build
  • Rainwater Harvesting
  • Roofing
  • Scaffolding
  • Screed
  • Sewerage
  • Slates
  • Sliding Doors
  • Soakaway
  • Solar Panels
  • Staircase
  • Studwork
  • Underfloor Heating
  • Utilities
  • Velux
  • Windows
  • March 2024
  • February 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • March 2022

Copyright © 2025 Dreamers Corner | Powered by Astra WordPress Theme