Update for Friday 13 May 2022

The bank at the top of the field was dug back ready for the retaining wall and the corner next to the neighbour’s drive was tidied up.

The tree trunk and some of the hedge at the top of the field were dug out in preparation for the electricity cable.

The site was dug down and levelled to start marking out the house layout on Monday.

What a fabulous first week with excellent site preparation progress.