Monday 16 May 2022

Today the site was levelled and we started to mark out the outline of the house and driveway. It’s very exciting to see the shape of the building laid out on the ground and get a feel for how it sits within the plot.
A small trench was dug at the side of the entrance for the water to come onto the site on Wednesday. This is where the water meter and stop cock valve will be located.